Page 52

20029BB

At left, the painters putting the final coat of paint on the stairway. Top right, hanging from the structure while painting the outside. Below, a worker sands the interior wall of the structure. 52 GASPARILLA ISLAND May/June 2017


20029BB
To see the actual publication please follow the link above